L&T bags order related to Muri Ganga River bridge in West Bengal
Larsen &Toubro's (L&T) transportation infrastructure business vertical has bagged an order for an arterial Cable-Stayed Bridge over the Muri Ganga River in the South 24 Parganas district of West Bengal.
The scope of work involves the construction of a 2+2 lane 3.2 km Extradosed Cable-Stayed Bridge with a maximum span of 177m, along with a 0.9 km approach road on the Kakdwip Side and a 0.65 km approach road on the Sagar Island side. As per L&T's classification, it is a significant project which is valued between Rs 1,000 crore to Rs 2,500 crore.
