Patna Metro: Electrification of phase 1 begins
The RPG group firm KEC International has informed that the electrification of the Patna metro has begun. As per the firm, the installation of electrification masts for the 25 kV overhead equipment (OHE) traction system of Patna Metro’s Phase 1 project under Package PE-03 has begun.
KEC International was awarded the Rs. 131.89 crore electrification contract (Package PE-03) in April 2022.
Also Read: Patna Metro: SAIL Bags ISBT Depot's Contract