Jaipur metro: Afcons declared lowest bidder for phase 1C contract
Jaipur Metro Rail Corporation (JMRC) has informed that Afcons Infrastructure has emerged as the lowest bidder (L one bidder) for the civil construction work (Package UG-03) of Jaipur Metro’s new 3.41 km Phase 1C connecting Badi Chaupar to Transport Nagar. Afcons placed a bid of Rs 630.45 crore.
The new phase will extend Jaipur’s operational 11.98 km Pink Line (Mansaravor – Badi Chaupar) eastward to Transport Nagar. 2.65 km of the route will be built underground (twin tunnels) through the old city with 1 new station at Ramganj Chaupar, while 0.76 km will be built elevated with 1 new station at Transport Nagar.
The scope of the work involves Design and Construction of Twin Tunnel by Shield TBM, Underground Station (Ramganj Chaupar), Cut and Cover Tunnel Box and Underground Ramp from Badi Chaupar to dead end Ch: 10387.860 to Underground ramp end Ch: 13040 of Jaipur Metro Phase-1C including entry exit structures, architectural finishing, water supply, sanitary installations and drainage works at Jaipur.
Also Read: Jaipur Metro: Tender Floated For Work Worth Over Rs 260 Crore
