Mumbai Metro: MMRDA plans to build foot over bridges along line 9
The Mumbai Metropolitan Region Development Authority has plans to develop 7 foot over bridges (FOBs) along the Metro Line 9 corridor. As per MMRDA, the idea is to improve pedestrian safety and make it easier for people to reach metro stations in Mira-Bhayandar.
The FOBs will be developed at:
- Dahisar Toll Naka – 145 metres
- Miragaon – 87 metres
- Veg Sagar Hotel – 88 metres
- Sai Baba Nagar – 80 metres
- Shivar Garden – 80 metres
- Maxus Mall – 83 metres
- Kashigaon – 92 metres
Line 9 is a 11-km long corridor 8 stations running between Dahisar East and Mira-Bhayandar.
Also Read: Mumbai water metro project: MoU signed with Norwegian firm
