Mumbai Metro: Lowest bidder for contract related to line 12 announced
Metropolitan Region Development Authority (MMRDA) has declared Gawar Constructions Ltd. (GCL) as the lowest bidder (L one bidder) for the civil construction work of Mumbai Metro’s Line-12 (Orange Line) which will connect Kalyan – Dombivali – Amandoot (Taloja).
GCL placed a bid of Rs 2037.20 crore. Line-12 with 19 elevated stations will be built as a 22.17 km long southern elevated extension of the partially under construction 23.53 km Line-5 (Thane – Bhiwandi – Kalyan) at an estimated cost of Rs 4,132 crore.
The scope of the work involves the part design and construction of an elevated viaduct (chainage -860.224 m to +21316.022 m) and 19 elevated stations viz. Kalyan, APMC Kalyan, Ganesh Nagar, Pisavali Gaon, Golavli, Dombivli MIDC, Sagaon, Sonarpada, Manpada, Hedutane, Kolegaon, Nilje Gaon, Vadavli (khu), Bale, Waklan, Turbhe, Pisarve Depot, Pisarve, Amandoot, including connecting line to the depot from mainline reference chainage 12+543 from Vadavli (khu) (chainage 0+000 to 1+393) of line 12 [Kalyan-Taloja] [excluding architectural finishing & pre-engineered steel roof structure of stations] of Mumbai Metro.
Also Read: Mumbai Metro: Contract Related To Kanjurmarg Depot Attracts 2 Bids