Coal India's subsidiary floats tender for 40 MW solar project
The subsidiary of CIL Navikarniya Urja has floated an EPC tender for a 40 MW solar power project at Johilla Area, Umaria, Madhya Pradesh. As per the tender, the scope of work includes design and engineering, procurement and supply of equipment and materials, erection, testing, and commissioning of a 40 MW grid-connected ground-mounted solar project.
The period of completion of the work is 12 months and the last date to submit the bids is November 26, 2024.
