Order worth Rs 1,402 crores bagged by Ramky Infra
Construction engineering firm Ramky Infrastructure has bagged an EPC order of Rs 1,401.84 crores (including GST). The order is for infrastructure works at Dighi Port Industrial Area Phase 1 under the Delhi-Mumbai Industrial Corridor.
The period of completion of the work is around 2.5 years (930 days), along with the Operations and Maintenance (O&M) of 4 years. Work covers end-to-end delivery from design and engineering through construction, testing, commissioning, and performance-based operations.
Also Read: Ramky Infrastructure bags order worth Rs 217 crore
