Ahemdabad metro's extradosed bridge over Narmada: Final segment launched
Gujarat Metro Rail Corporation (GMRC) managed Ahmedabad metro saw a breakthrough recently. Afcons Infrastructure which is executing the project informed launching their final of 105 precast box segments for 28.25 km Ahmedabad Metro Phase 2 project’s 303m long extradosed bridge over Narmada Canal.
The scope of the work awarded to Afcons includes the line’s 8.124 km elevated section from Motera Stadium to GNLU with 8 stations at Koteshwar Road, Vishwakarma College, Tapovan Circle, Narmada Canal, Koba Circle, Juna Koba, Koba Gam, and GNLU.
Also Read: Ahmedabad Metro: Siemens Bags Phase 2 Elecrtification Contract
