Chennai Metro: 6 firms place bid for contract related to Line 4
Chennai Metro Rail Ltd. (CMRL) has informed that 6 firms have placed bids for Line-4’s ventilation and air conditioning (VAC), tunnel ventilation system (TVS), and electrical and SCADA contracts. The 26.09 km long line under phase 2 will connect Light House – Poonamallee Bypass through 30 stations. It will consist of a 10 km underground section with twin tunnels connecting the Power House Ramp and Light House Station.
The bidders for the project are:
- ABS Fujitsu General Pvt. Ltd.
- Blue Star Ltd.
- EFKON India Pvt. Ltd.
- ETA Engineering Pvt. Ltd.
- Larsen & Toubro Ltd.
- Universal MEP Projects & Engineering Services Ltd. (a subsidiary of Voltas)
The scope of work involves design verification & validation, supply, installation, testing, commissioning, supply of spares & special tools, operations and maintenance during 2 years defect liability period (DLP) and 5 years comprehensive annual maintenance contract (CAMC) of a ventilation and air conditioning (VAC), tunnel ventilation system (TVS), associated electrical and integrated SCADA works for eight (08) underground stations in corridor-4 (C4) from Lighthouse to Kodambakkam Station, including C4 related TVS SCADA works at Thirumayilai Station and integrated station management systems (ISMS) at OCC and BOCC.
Also Read: Chennai Metro: 5 Firm Place Bids For Electrical And Mechanical Contract