Chennai Metro: Phase 2 related project attracts 8 bidders
Chennai Metro Rail Ltd (CMRL) has informed that 8 design and engineering firms have bid to prepare 3 detailed feasibility reports (DFR) for extending the 118.9 km Chennai Metro Phase 2 project by 93 km to connect Kilambakkam, Parandur Airport, and Avadi.
Extensions include:
- Line-3: Siruseri to Kilambakkam Bus Terminus via Kelambakkam (26 km)
- Line-4: Poonamallee to Parandur Airport (50 km)
- Line-5: Koyambedu to Avadi via Thirumangalam, Mugappair (17 km)
Bidders for the packages are:
- Package I Bidders (Line-4)
- Aarvee Associates Engineering & Consultants Pvt. Ltd.
- AECOM India Pvt. Ltd.
- RINA Consultant S.P.A
- Urban Mass Transit Company Ltd.
Package II Bidders (Line-5)
- RITES Ltd.
- L&T Infra Engineering Ltd
Package III Bidders (Line-3)
- Balaji Railroad Systems Pvt. Ltd.
- Systra MVA Consulting (India) Ltd.
Also Read: Chennai Metro: CMRL Plans To Expand Parking Lot At Certain Stations