Mumbai Metro's Project Won By NCC
Mumbai Metropolitan Region Development Authority (MMRDA) has informed that NCC Ltd emerged as the lowest bidder among 3 firms for completing pending civil work on a 5.868 km section (Package C102) of Mumbai Metro’s Line-2B (Yellow Line) between MTNL – Chembur stations. NCC won the project with a bid of Rs 791.15 crore.Â
The scope of the work involves the part design and construction of balance works of package CA06, Elevated Viaduct and 5 Elevated Stations viz. MTNL Metro, S. G. Barve Marg, Kurla East, EEH and Chembur (excluding Architectural Finishing and Pre-Engineered Steel Roof Structure of Stations) from Chainage 46860.384m to Chainage 52729.312 of Line 2B.
