Nagpur to Chandrapur Expressway: 9 firms place bid for construction work
Maharashtra State Road Development Corporation (MSRDC) has informed that 9 civil engineering firms have submitted 22 bids for the 182 km Nagpur – Chandrapur Expressway project on EPC mode in eastern Maharashtra.
4 lane access-controlled highway project will have its northern terminal at Seldoh village on the 701 km Mumbai – Nagpur Expressway (Samruddhi Mahamarg or ME-2). Further, it will include a 11.969 km spur to Chandrapur city, and eventually terminate at village Ghatkul.
The project is divided into various packages:
- NC-01: km 0+000 Seldoh Tq. Seloo to km 33+300 Lonhar Tq. Samudrapur Dist. Wardha (Length: 33.300 km)
- NC-02: km 33+300 Lonhar Tq. Samudrapur Dist. Wardha to km 63+150 Borgaon Deshmukh Tq. Warora Dist. Chandrapur (Length: 29.850 km)
- NC-03: km 63+150 Borgaon Deshmukh Tq. Warora to km 90+400 Chargaon Tq. Bhadravati (Length-27.250 km) with Chandrapur connector from km 0+000 Pandhar Kawada on MSH-6 to km 11+969 Datala Tq. Dist. Chandrapur (Length-11.969 km) (Total Length: 39.219 km)
- NC-04: km 90+400 Chargaon Tq. Bhadravati to km 118+600 Nandgaon Kh Tq. Korpana Dist. Chandrapur (Length: 28.200 km)
- NC-05: km 118+600 Nandgaon Kh. Tq. Korpana to km 150+350 Jogapur Tq. Ballarpur Dist. Chandrapur (Length: 31.750 km)
- NC-06: km 150+350 Jogapur Tq. Ballarpur to km 182+395 Ghatkul Tq. Gondpimpari Dist. Chandrapur (Length: 32.045 km)
The bidders for the projects are:
- Afcons Infrastructure Ltd.: NC-01 & NC-02
- BSCPL Infrastructure Ltd.: NC-02, NC-03 & NC-06
- G R Infraprojects Ltd.: NC-01 only
- Gawar Construction Ltd.: NC-02, NC-03, NC-04, NC-05 & NC-06
- H.G. Infra Engineering Ltd.: NC-03, NC-04, NC-05 & NC-06
- Montecarlo Ltd.: NC-01 & NC-02
- NCC Ltd. – NC-01 only
- Patel Infrastructure Ltd.: NC-05 & NC-06
- PNC Infratech Ltd.: NC-03 & NC-04
Also Read: Jalna To Nanded Expressway Project: 10 Firms Place Bid For The Work