Surat to Chennai Expressway Order Bagged By Ashoka Buildcon and PNC
National Highways Authority of India (NHAI) has informed that PNC Infratech and Ashoka Buildcon have bagged Packages 2 and 4 in Karnataka of the Solapur-Kurnool-Chennai Economic Corridor (NH-150C), which forms the southern section of what’s known as Surat – Chennai Expressway. Package 2 is bagged for a bid of Rs 1575 crore by PNC Infratech. Ashoka Buildcon bagged package 4 with a bid of Rs 1079 crore.
Scope of work under package 2 involves the Construction of 6 Lane with Access Controlled Greenfield Highway from km 26.000 to km 97.000 MH or KN Border (Badadal) to Maradgi S Andola section of NH150C (Pkg-2 of Akkalkot to KN or TS Border section).
Package 4 work involves the development of 6 lane Access Controlled Greenfield Highway from Km 162.500 to Km 203.100 Baswantpur to Singnodi section of NH 150C (Pkg 4 of Akkalkot KNT or TS Border). The packages are to be executed on HAM under Bharatmala Pariyojna.
Also Read: Tender Worth Over Rs 935 Crore Floated By Eastern Coalfields