Waaree Renewable bags order for solar project from Rajasthan
Mumbai-based clean energy firm Waaree Renewable Technologies has bagged an EPC order for a 450 MWp ground-mounted solar power project in Bikaner, Rajasthan. According to the firm, the order was received from a leading domestic independent power producer (IPP).
The financial details of the order were not made public by the firm. The scope of work covers engineering, procurement, and construction (EPC), including design, engineering, supply, installation, testing, and commissioning. It is scheduled for completion in the financial year 2027–28 (FY28).
Also Read: Order worth over Rs 330 crore bagged by GK Energy in Maharashtra
