TGGENCO floats tender for BESS project
Telangana government body, Telangana Power Generation Corporation (TGGENCO) has floated a tender to develop a pilot project for a standalone battery energy storage system (BESS) with a 250 MW/500 MWh capacity. As per the tender, the selected bidder would be eligible for viability gap funding of €2.7 million per MWh or 30 percent of the project’s capital cost, whichever is lower.
The last date for bid submission is February 21st, 2025.
Also Read: SECI floats tender for BESS in Kerala