HBL Engineering bags order from West Central Railway for KAVACH
HBL Engineering Limited has bagged an order worth Rs 54.12 crore from West Central Railway (WCR). The order involves the comprehensive survey, design, supply, installation, testing, and commissioning of trackside KAVACH equipment at 18 stations and LC Gate locations.
The work further covers tower erection across the Kota-Ruthiyai section and the Sogaria-Kota "C" Section (166 Rkm) of the Kota division, with a period of completion of 700 days.
Also Read: Railways floats tender worth Rs 2,200 crore for Kavach